In 2005 application was made to the Canada Saskatchewan Water Supply Expansion Program (CSWEP) for funding to execute a feasibility study assessing surface water availability and evaluating water development alternatives along the North Saskatchewan River.
In late May of 2006, the NSRWRC was notified that the application for study funding was approved under the CSWEP. The funding provided 90% of the study costs, the remaining 10% required matching at the local level.
After an intense 5 week fundraising campaign, the matching funds were raised through contributions from the following municipalities and organizations in Northwest Saskatchewan and Northeast Alberta:
Village of Aquadeo |
North East Alberta Water Management Coalition |
RM of Battle River |
City of North Battleford |
Town of Battleford |
RM of North Battleford |
RM of Britannia |
Town of Turtleford |
RM of Eldon |
County of Vermillion River |
City of Lloydminster |
Battlefords REDA |
RM of Mervin |
RM of Frenchman Butte |
A Request for Proposals was issued in August after the Terms of Reference of the Study was developed. Proposals were received and the contract was awarded in October 2006 to Golder Associates.
The "North Saskatchewan Water Supply Feasibility Study"
- Phase 1: Initial Scoping
- Conceptual design of selected options:
- Status quo (no action)
- Non-structural investment (i.e. small-scale irrigation)
- Off-channel storage for irrigation
- Highgate Dam for irrigation, hydropower, recreation, flood control
- Preliminary estimates of benefits and costs
- Preliminary inventory of issues
- Comparison of options
- Phase 2: thoroughly evaluate one of these alternatives in greater detail, as determined by the NSRWRC Board of Directors
Public meetings were conducted in February 2007 to discuss the scope of the study and gain feedback on the priorities of the region. Phase 1 was completed in September and further public meetings were held to present the findings.
A decision was made to take the following action on Phase 2:
- Provide information to fill key data gaps (Highgate Dam)
- First Nations issues
- Road & rail crossing
- Design flood
- Next steps for environmental assessment
- Conceptual design & preliminary assessment of 1 new option
- Weir system
- Identify key issues
- Compare solutions
Phase 2 was completed in March of 2007 and results were presented at a Public Meeting on February 27, 2008 at the Legion Hall in Maidstone, SK.
Final Report
Appendix A Enviro Social Issues
Appendix B Benefits and costs
Appendix C Hydropower assessment
Appendix D1 Highgate Dam Investigations
Appendix E1 Regional economic assessment
Appendix E2 Addendum
Appendix F Highgate Dam alignment sheets
Appendix G Public consultation presentation Maidstone
Appendix H Initial Consultation Summary
Appendix I Phase 1 consultation Lloydminster
Appendix I Phase 1 consultation North Battleford
Appendix I Phase 1 consultation Turtleford
Appendix J1 Phase 2 consultation Maidstone
Appendix J2 Highgate FN letter
Figures
NSR REPORT 080430
Tables
Google Earth Locations - NSR_Apr2008
 |